• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name V. Sulkosky

    Log entry time 18:25:29 on February 24, 2011

    Entry number 348474

    This entry is a followup to: 348279

    keyword=SRC N-efficiency Timing Information and setup II

    Times to get from target to point at which EDTM is injected
    
     Electron into L-HRS: (3.1 GeV/c)
    
      87   TOF (26 m to s2m)
      60   Signal cable from PMT
     ---
     147 ns
    
     Proton into R-HRS:
     
     0.585 GeV/c
     -----------
     0.53  Beta 
     151   TOF  (24 m to s2m)
      60   Signal cable from PMT
     ---
     211 ns 
    
     Time difference between proton and electron signals to EDTM injection point:
    
    
        0.585 GeV/c (proton)
       ------------------------------
    R-L = 64 ns
    
    The edtm configuration for this is set to (same as the previous setting)
    
    ./edtmsetup 0 112 232
    
    though the proton comes about 23 ns earlier for this setting.
    
    
    The T5 coincidence is formed with an overlap between T1 and T3.  The
    electron (T3) was chosen to carry the T5 time.  To get a proper delay
    with the EDTM pulses, I choose the following delay for T3:
    
    ./t3_delay 72
    
    same as before to preserve the previous timing.
    
    


    A copy of this log entry has been emailed to: doug,kalyan,rshneor,danez,yez