NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 18:25:29 on February 24, 2011
Entry number 348474
This entry is a followup to: 348279
keyword=SRC N-efficiency Timing Information and setup II
Times to get from target to point at which EDTM is injected
Electron into L-HRS: (3.1 GeV/c)
87 TOF (26 m to s2m)
60 Signal cable from PMT
---
147 ns
Proton into R-HRS:
0.585 GeV/c
-----------
0.53 Beta
151 TOF (24 m to s2m)
60 Signal cable from PMT
---
211 ns
Time difference between proton and electron signals to EDTM injection point:
0.585 GeV/c (proton)
------------------------------
R-L = 64 ns
The edtm configuration for this is set to (same as the previous setting)
./edtmsetup 0 112 232
though the proton comes about 23 ns earlier for this setting.
The T5 coincidence is formed with an overlap between T1 and T3. The
electron (T3) was chosen to carry the T5 time. To get a proper delay
with the EDTM pulses, I choose the following delay for T3:
./t3_delay 72
same as before to preserve the previous timing.
A copy of this log entry has been emailed to: doug,kalyan,rshneor,danez,yez