• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Saha

    Log entry time 16:02:12 on March 1,2011

    Entry number 349414

    keyword=Shift Summary

    Shift Summary

    E08-010 Kinematic #1 Productio Running
    Target LH2 4cm Loop 2 15 uA

    Run 2082 1.57m events
    Run 2083 1.46m events

    MCC doing beam studies.
    Hall A in Controlled Access

    Changed to Kinematics #2.
    LHRS: 528 MeV/c 12.5 degrees
    RHRS: 805 MeV/c 12.5 degrees

    Magnets powered and cycled

    MCC delivering 5 uA cw. Beam position and raster OK

    Harp scan with raster off. DX(4A) = 450 um DY(4A) = 340 um
    Jay is cycling quads to get better beam size