Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Saha
Log entry time 16:02:12 on March 1,2011
Entry number 349414
keyword=Shift Summary
Shift Summary
E08-010 Kinematic #1 Productio Running
Target LH2 4cm Loop 2 15 uA
Run 2082 1.57m events
Run 2083 1.46m events
MCC doing beam studies.
Hall A in Controlled Access
Changed to Kinematics #2.
LHRS: 528 MeV/c 12.5 degrees
RHRS: 805 MeV/c 12.5 degrees
Magnets powered and cycled
MCC delivering 5 uA cw. Beam position and raster OK
Harp scan with raster off. DX(4A) = 450 um DY(4A) = 340 um
Jay is cycling quads to get better beam size