00:00 Start shift - Setting #11 production in progress
02:33 Flammable gas shed low alarm
02:52 Finish setting #11, configure for 12
03:28 LHRS at 48 degrees, starting at 80uA on 4cm LH2
04:36 Start boiling tests
05:48 Finish boiling, moving to BeO
05:53 Start 5min BeO
05:59 Move to 4cm Al dummy
06:02 Start 1 hour Al
06:40 No beam - RF zone down
07:00 Resume beam
07:21 Move to LH2
07:26 Resume production @ 80uA
08:00 End shift
Good Production/Calibration Runs
Setting #11
2428 55uA 4cm LH2 2M events
2429 55uA 4cm LH2 2M events
2430 55uA 4cm LH2 2M events
2432 55uA 4cm LH2
2433 55uA 4cm LH2 2M events
2434 55uA 4cm LH2 2M events
2435 55uA 4cm LH2 2M events
Setting #12
2436 80uA 4cm LH2 1.3M events
2437 80uA 4cm LH2 1M events
2438 80uA 4cm LH2 1M events
2439 10uA 4cm LH2 50k events
2440 20uA 4cm LH2 63k events
2441 30uA 4cm LH2 84k events
2442 40uA 4cm LH2 113k events
2443 50uA 4cm LH2 20k events
2444 50uA 4cm LH2 148k events
2445 60uA 4cm LH2 168k events
2446 70uA 4cm LH2 206k events
2447 80uA 4cm LH2 288k events
2448 20uA BeO 47k events
2449 20uA 4cm Al 350k events
2450 20uA 4cm Al 196k events
2451 80uA 4cm LH2 1M events
2452 80uA 4cm LH2 In progress
This shift for setting #11: 0.52 C
Total charge for setting #11: 1.44 C
Accumulated charge for setting #12: 0.50 C