• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name jmammei

    Log entry time 17:51:07 on March 06, 2011

    Entry number 350585

    Followups:

    keyword=Run plan for overnight Sunday / Monday day

    *Please keep track of the coulomb count for the good runs and record it in the shift summary!

    *Make sure the 3rd person replays the data and looks at the online GUI and the ndelta plots for every run.
    - Every 5 runs or so, a full replay should be done to look at the synch-ROC plots.

    *We are doing the run plan a little out of order. For each of the following settings, you have to move the LHRS, but the RHRS doesn't change until the last two settings.

    #9 756 mC; 15cm LH2; 40uA; LHRS 21.0 degrees, 646 MeV; RHRS doesn't change
    - 20 min Al
    - 5 min BeO

    #10 756 mC; 15cm LH2; 50uA; LHRS 41.5 degrees, 646 MeV; RHRS doesn't change
    - 20 min Al
    - 5 min BeO

    #13 324 mc; 15cm LH2; 50uA; LHRS 37.5 degrees, 574 MeV; RHRS 20.5 degrees, 826 MeV
    - 20 min Al
    - 5 min BeO

    #14 216 mC; 15cm LH2; 50uA; LHRS 34.5 degrees, 621 MeV; RHRS 21.0 degrees, 789 MeV
    - 20 min Al
    - 5 min BeO

    *** At each setting, check the signal-to-noise in the standard plots (instructions posted near adaql2) and adjust the prescales to get the rates posted on the white board. Post the plots. We may decide to run at lower currents.

    Please don't hesitate to call the RC phone if you have any questions.