User name averett
Log entry time 15:47:43 on March 07, 2011
Entry number 350849
keyword=Day Shift Summary
Day Shift SUmmary
0800 Change configuration to #13
0900 Begin optics data on BeO at 20uA
0905 Move to 15 cm Al dummy target, 20uA
0925 Move to 15cm, LH2 target, 35uA
1200 Change configuration to #14, move to BeO target
1240 Begin production running, BeO, 15cm dummy, 20uA
1304 Move to 15cm LH2 target, 35uA
1500 Finish N-Delta run, set up for SRC
1530 Lost contact with target fan
1544 spectrometers set to LHRS=54.5 deg, P=764.2 MeV/c
RHRS=14.0 deg, P=789 MeV/c
1545 Request access to reset target fan controller