keyword=Cryotarget cool-down completed
Dave Meekins completed cryotarget cool-down.
Loop 1 has He4 gas at 21K, 55 psia (relatively low pressure).
Loop 2 has LD2 at 22K, 32 psia.
Both loops now set at 24 Hz (10%). Will need to change to 48 Hz (20%)
for the one to be used in beam.
If Hall C is not going to cool-down Qweak target tomorrow, then Dave will increase loop 1 He pressure to high pressure for regular running.
Alarms are set for tonight (low pressrue condition for loop 1).