    keyword=Cryotarget cool-down completed

    Dave Meekins completed cryotarget cool-down.
    Loop 1 has He4 gas at 21K, 55 psia (relatively low pressure).
    Loop 2 has LD2 at 22K, 32 psia.
    Both loops now set at 24 Hz (10%). Will need to change to 48 Hz (20%)
    for the one to be used in beam.
    If Hall C is not going to cool-down Qweak target tomorrow, then Dave will increase loop 1 He pressure to high pressure for regular running.