Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name kai
Log entry time 03:40:25 on March13,2011
Entry number 351417
keyword=heat power drops to zero due to MCC chamber calibration
MCC is doing the ion chamber calibration. It looks like they applied a high current on the target, and the heater power drops to zero (soon back on because the beam is on and off very frequently). In this case, I opened the JT valve by one step. I will keep monitoring it.
FIGURE 1
FIGURE 2