• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name V. Sulkosky

    Log entry time 13:15:55 on March14,2011

    Entry number 351776

    Followups:

    keyword=Scope Trace BB Retiming

    Scope tracing of BB retiming:

    yellow: L1A (nim-bar)
    cyan: BB E-plane singles (not delayed)
    magneta: retimed L1A
    green: retimed L1A as veto

    I did not have an extra copy of the delay E-plane singles trigger
    that goes into the retiming circuit. Hence the cyan appears earlier
    than in reality. This signal is actually delayed by about 160 ns
    and comes after the L1A by about 40 ns.


    FIGURE 1