• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Xiaohui

    Log entry time 18:37:38 on March 14, 2011

    Entry number 351820

    keyword=Run plan update

    Run plan update (Mon. swing - Tue. day):

    ----------------------------------------------------------

    * Keep running on slanted carbon with 20 uA until the cryo is more stabilized.

    * When 15K coolant is stable, change target to 10cm LD (loop2), run with 3uA (up to 5uA).

    * Stop run before the beam study (10am - 2pm) tomorrow, left Q1 work continues (Jack), turn both HRS Q1 off. Move the HRS angles and set the momentum (except for Q1).

    * All cryo target needs to be filled with full pressure. (Dave)

    -------------------------------------------------------------

    * Note: tornado drill Tuesday at 9:45am, The shift crew (shift leader and target operator) should stay in the counting house and are supposed to go somewhere safe internally (stairwell or down into the hallways outside the experimental halls - obviously don't go in the elevator)



    A copy of this log entry has been emailed to: doug,eip, gilad, vasulk, jwwatson,rom,orchen,igorko,nmuangma,zhanxh,camsonne@jlab.org