Please note that all times are approximate | |
00:00 | Taking production runs on 10cm LD2, beam at 3 μA. 3rd hasn't shown up for shift. |
01:40 | TO closed the JT Valve 2 steps to bring the heater temperature down in an attempt to decrease the incoming 15K temperature. |
03:55 | Increased beam to 3.5 μA per Or's request. Recalculated prescales for T1/3/6/7 = 80/80/100/100 Hz. |
08:00 | Turned things over to the Day Shift, with run 2833 still running. |
Run | Events | Time [mins] | Current [μA] | Deadtime [%] | Target | Comments |
2822 | 1000336 | 42.659 | 3 | 20.26 | 10cm LD2 | production run |
2823 | 999649 | 42.256 | 3 | 20.22 | 10cm LD2 | production run |
2824 | 999849 | 42.457 | 3 | 20.39 | 10cm LD2 | production run |
2825 | 999950 | 41.687 | 3 | 20.33 | 10cm LD2 | production run |
2826 | 1000620 | 41.146 | 3 | 20.60 | 10cm LD2 | production run |
2827 | 1000392 | 41.632 | 3 | 20.36 | 10cm LD2 | production run |
2828 | 1000116 | 42.787 | 3.5 | 19.72 | 10cm LD2 | production run, beam current increased, prescales recalculated |
2829 | 999953 | 41.724 | 3.5 | 19.65 | 10cm LD2 | production run |
2830 | 999767 | 43.612 | 3.5 | 19.62 | 10cm LD2 | production run |
2831 | 1000048 | 41.761 | 3.5 | 19.74 | 10cm LD2 | production run |
2832 | 641813 | 30.487 | 3.5 | 20.88 | 10cm LD2 | production run, stopped early due to ROC10 hanging |