    Log entry time 08:10:17 on March 15, 2011

    Entry number 351898

    keyword=Owl Shift Summary

    SL: David Anez
    TO: Konrad Aniol
    3rd:

    Owl Shift Summary
    =================
    Plan: SRC Triple Coincidence Runs

    Kinematic Settings
    Please note that all times are approximate
    00:00Taking production runs on 10cm LD2, beam at 3 μA. 3rd hasn't shown up for shift.
    01:40TO closed the JT Valve 2 steps to bring the heater temperature down in an attempt to decrease the incoming 15K temperature.
    03:55Increased beam to 3.5 μA per Or's request. Recalculated prescales for T1/3/6/7 = 80/80/100/100 Hz.
    08:00Turned things over to the Day Shift, with run 2833 still running.


    Run Events Time [mins] Current [μA] Deadtime [%] Target Comments
    2822 1000336 42.659 3 20.26 10cm LD2 production run
    2823 999649 42.256 3 20.22 10cm LD2 production run
    2824 999849 42.457 3 20.39 10cm LD2 production run
    2825 999950 41.687 3 20.33 10cm LD2 production run
    2826 1000620 41.146 3 20.60 10cm LD2 production run
    2827 1000392 41.632 3 20.36 10cm LD2 production run
    2828 1000116 42.787 3.5 19.72 10cm LD2 production run, beam current increased, prescales recalculated
    2829 999953 41.724 3.5 19.65 10cm LD2 production run
    2830 999767 43.612 3.5 19.62 10cm LD2 production run
    2831 1000048 41.761 3.5 19.74 10cm LD2 production run
    2832 641813 30.487 3.5 20.88 10cm LD2 production run, stopped early due to ROC10 hanging

    General Comments