03/15/11 Swing Shift Summary
On shift:
SL: Ellie Long
TO: Todd Averett
3rd: Tim Holstrom
· 08:00 Good morning, Hall A! The shift starts in
Production with 3.5uA on D target on run 2833.
· 09:08 Run Coordinator noticed that the Beam Time
Accounting didn't seem to be outputting to the HALog. Restarted the BTA
GUI.
· 09:45 OMG A TORNADO!!! RUN!!!! Fleeing the area with the
3rd for safer ground! Target Operator ties himself to a heavy pipe using
his leather belt and waits it out. (Actually just a tornado drill)
· 09:55 Whew! Tornado over! Make it back upstairs safe and
sound and the TO is back after his short visit to Oz. (Tornado drill
over)
· 10:00 MCC called to begin Beam Studies. We called for
Controlled Access during this time.
· 15:15 RC asked for Restricted Access, which we've gone
into.
· 16:00 Finished shift with no beam and work being done on
the spectrometer magnets. Next shift leader: Be sure to check the
kinematics settings with the RC (Alexandre) as I believe they are
changing them.
Production Runs:
Run
# | Current | Target | #
of Events | Comments |
2833 | 3.5uA | 10cm Loop 2
He | 1M | |
2834 | 3.5uA | 10cm Loop 2
He | 1M | |
2835 | 3.5uA | 10cm Loop 2
He | 1.1M | |
Junk Runs:
Run
# | Current | Target | #
of Events | Comments |
2836 | ---- | 10cm Loop 2
He | 70k | No beam during run |