Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Solvignon
Log entry time 16:00:02 on March16,2011
Entry number 352153
keyword=Day shift summary
8:00 starting the day shift in production mode on 4He.
9:19 Hall C is started the cooldown of their target. We moved our target to slanted C.
9:30 Beam study starts. Ask to have Hall A in controlled access.
13:00 Beam study done. Waiting for beam.
13:20 Tuned beam.
13:28 Done with tuned beam. Moved target from empty to BeO.
13:35 Asked for a Harp scan. Beam size good in 4A: x=124, y=155. 4B scan cannot be done due to hardware problem.
13:49 Start pointing and optics study.
14:25 Moved target from BeO to optics.
14:28 Ready for beam.
15:19 Start moving the Left sieve slit in.
15:25 Left sieve slit is in.
----------------------------------------------------------------------
Run summary:
------------
* kinematics: Left Pe=3.6014 GeV/c, thetae=20.3deg
Right Pp=1.3825 GeV/c, thetap=33.5deg
I_BB = 518A
07:59-08:25 run# 2865 He4 275K events problem with HAND ND N6 left ADC
08:28-09:20 run# 2866 He4 557K events good
13:52-14:25 run# 2868 Be0 202K events raster off
14:31-15:03 run# 2869 optics 181K events 10uA
15:07-15:16 run# 2870 optics 29K events 10uA (test F1)
15:27-??-?? run# 2871 optics ongoing 25uA, left sieve in