• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name danez

    Log entry time 07:58:26 on March 17, 2011

    Entry number 352250

    keyword=Owl Shift Summary

    SL: David Anez
    TO: Konrad Aniol
    3rd: Sophia Iqbal

    Owl Shift Summary
    =================
    Plan: SRC Triple Coincidence Runs

    Kinematic Settings
    Please note that all times are approximate
    00:00Taking production runs on 20cm He4, beam at 13 uA.
    01:00MCC turned off beam to prepare for high current to Hall C.
    01:10Beam back, continued production.
    02:20MCC called to say they're having trouble with Hall C's beam, beam will be down.
     Switched to 10cm LD2 target for short run when beam returns.
    02:30Beam back, changed prescales and started 30 min run on LD2.
    03:15Switched back to 20cm He4 target to continue production.
    07:00Went to controlled access with a full survey in preparation for target work.
    07:30Survey done.
    08:00Turned things over to Day Shift.


    Run Events Time [mins] Current [uA] Deadtime [%] Target Comments
    2884 954332 71.218 13 6.81 20cm He4 production run, stopped early when MCC shut down beam
    2885 767235 62.804 13 6.59 20cm He4 production run, stopped early when MCC shut down beam
    2886 707833 35.583 3.5 9.79 10cm LD2 deuterium run
    2887 998606 71.255 13 6.71 20cm He4 production run
    2888 998206 83.940 13 6.67 20cm He4 production run
    2889 917409 65.994 13 6.73 20cm He4 production run, stopped early to go to controlled access

    General Comments