• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name eschulte

    Log entry time 13:20:19 on March 19, 2011

    Entry number 352579

    keyword=Extended Beam Down Run 2940

    Modestly extended beam down period (<5 minutes) with low current on recovery. Beam ramped up slowly back to 5uA. Run 2940.

    Beam recovered with acceptable beam positions. No reason given in Elog at the time of this posting, nor did MCC call.