• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name orchen

    Log entry time 02:06:17 on March 20, 2011

    Entry number 352648

    This entry is a followup to: 352642

    keyword=BB (e,e'p_recoil) from run 2942 (2.5uA)

    Here is the TOF peak.
    
    Do you think we should run with a lower current?
    [I will soon do the same with HAND]
    


    A copy of this log entry has been emailed to: eip@jlab.org, vasulk@jlab.org, camsonne@jlab.org, kalyan@jlab.org,orchen@jlab.org,igorko@jlab.org



    Figure 1