08:00 Starting shift with production data on 20cm 4He at 4uA.
08:45 Moved target to empty. MCC is going to send tuned beam before putting us in controlled access.
14:23 Beam permit
14:52 Tuned beam
15:04 CW beam on BeO
15:13 Moving to 20cm 4He
15:22 Target in place. Asked for 4uA.
15:31 LQ2 tripped
15:56 LQ2 ready. Asked for beam back.
16:00 Waiting for beam.
Run summary:
------------
* kinematics: Left Pe=3.6014 GeV/c, thetae=20.3deg
Right Pp=1.3825 GeV/c, thetap=33.5deg
I_BB = 518A
run# 3021 4He Good 0.01954 C
3022 4He Good 0.00444 C
---------
Total= 0.02398 C
* kinematics: Left Pe=3.6014 GeV/c, thetae=20.3deg
Right Pp=1.30825 GeV/c, thetap=29.0deg
I_BB = 518A
run# 3025 4He Junk 0.0 C