• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name yez

    Log entry time 17:17:51 on March 24, 2011

    Entry number 353087

    Followups:

    keyword=L-HRS: Cerenkov ADCs are still overfload after reducing HVs

    I analyzed the run#3025 after I reduced the HVs of Cerenkov. I still can see ADC overfload for all Cer counters, and there are not much different with ones before I reduced HVs. As you can see from the third figure, pion peaks still mix into high ADC channels of Cer.






    Figure 1



    Figure 2



    Figure 3