Shift started running production with run 3046 ongoing
19:38 MCC called. Taking the beam away in order to bring Hall B up.
19:54 Beam back. Starting run 3049
21:30 Right Q2 switched off. Restarted.
Shift ended in production.
Run list:
3046 1Mevents, 4uA
3047 1Mevents, 4 uA
3048 743Kevents, 4.5 uA
3049 1Mevents, 4.5 uA
3050 174Kevents, 4.5 uA
3051 1Mevents, 4.5 uA
Run BCM_U1(C) SUM(C)
3046 0.01939 0.01939 4He
3047 0.01807 0.03746 4He
3048 0.01539 0.05285 4He
3049 0.02072 0.07357 4He
3050 0.00381 0.07738 4He
3051 0.02070 0.09808 4He