• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Carlos Munoz

    Log entry time 23:54:06 on March25,2011

    Entry number 353226

    keyword=Swing shift summary


    Shift started running production with run 3046 ongoing

    19:38 MCC called. Taking the beam away in order to bring Hall B up.
    19:54 Beam back. Starting run 3049
    21:30 Right Q2 switched off. Restarted.

    Shift ended in production.

    Run list:

    3046 1Mevents, 4uA
    3047 1Mevents, 4 uA
    3048 743Kevents, 4.5 uA
    3049 1Mevents, 4.5 uA
    3050 174Kevents, 4.5 uA
    3051 1Mevents, 4.5 uA

    Run BCM_U1(C) SUM(C)
    3046 0.01939 0.01939 4He
    3047 0.01807 0.03746 4He
    3048 0.01539 0.05285 4He
    3049 0.02072 0.07357 4He
    3050 0.00381 0.07738 4He
    3051 0.02070 0.09808 4He
    Sum BCM U1 (C) = 0.09808