The shift started with a Right HRS dipole trip.
Later the accelerator had RF troubles and there was no beam for about 50 mins.
We took an hour of 15 cm dummy aluminium target.
There were a number of HV trip for the HAND plane 5 bar 3 scintillator.
Changes to the Left Dipole NMR locking parameters made the lock more stabe - fewer alarms.
A total of 0.0748 C on 4He (in runs 3103, 3107, 3108 and 3109)
Runlist ------- Run 3100 Right HRS Q2 tripped at end of run Run 3101 Junk: while resetting RHRS Q2 Run 3102 Junk?: Stable RHRS Q2 but BEFORE cycling Run 3103 Production 4He 20 cm Run 3104 no beam Run 3105 15 cm Al dummy Run 3106 15 cm Al dummy Run 3107 Production 4He 20 cm Run 3108 Production 4He 20 cm Run 3109 Production 4He 20 cm