• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name igorko

    Log entry time 01:38:45 on March 29, 2011

    Entry number 353547

    keyword=HAND N6-1L and N6 -2L problem

    I checked status of the detectors and noticed that we had two channels in
    HAND with low rate on scalers. N6 - 1L and N6 - 2L.
    
    Looking in HALOG, I saw that people don't bother to put the snapshots of
    HAND and BB. We should emphasize to shift workers to take picture of ALL
    scallers.
    
    In any case I looked on the ADC , TDC distribution for these channels,
    two plots attached. 
    From this plots we immediately see that we have a problem.
    I traced down the first run where we started to see this problem: #3113
    
    I checked the voltages settings and currents for these two PMs, and they
    were normal. HVGUI, showed that PMs are on (time to time, slight change
    in the currents/voltages - indication that GUI working).
    
    I power cyceled HV for these PMTs and restarted CODA.
    
    we succeded to take short run, 3117 before we lost the beam. 
    However, looking on the onlineGUI it's seems that problem fixed.
    


    A copy of this log entry has been emailed to: orchen,vasulk,eip,jixie



    Figure 1



    Figure 2