User name Carlos Munoz
Log entry time 15:55:16 on April 3,2011
Entry number 354272
keyword=Day shift summary
Shift started in production (run 3246)
9:15 Change half-wave plate (Hall C decision). This happened between runs 3246 and 3247.
10:00 Beam away for injector work.
10:45 Beam is back. Production resumed.
10:50 HV trip (2001 S13 L10.2); channel powercycled.
11:00 Noisy channels observed in replay, corresponding HV channels powercycled (fixed the problem)
Per RC's request we took 1 run at 2uA (3251) and 1 run at 8uA (3252), all others are 4uA.
14:55 Coda restarted (run 3253 would not record events).
15:04 Flammable gas sensors alarm. Reseted.
15:45 MCC has transmission problems. Taking the beam away for 10-15min. Run 3254 stopped.
15:54 Beam's back. Starting run 3255.
16:00 Running production run 3255.
ABU reported: 7.01
BANU: 0.28
Runlist (3248 was a spot++ test and 3253 is junk)
Run BCM_U1(C) SUM(C)
3246 0.01803 0.01803 4He
3247 0.01158 0.02961 4He
3249 0.00607 0.03568 4He
3250 0.01776 0.05344 4He
3251 0.00951 0.06296 4He
3252 0.02652 0.08948 4He
3254 0.01230 0.10178 4He
Sum BCM U1 (C) = 0.10178