• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name dhamilton

    Log entry time 09:35:14 on April 4,2011

    Entry number 354354

    keyword=BigHand layer 6 left HV power-cycle

    Stopped run 3268 early to power-cycle the HV on BigHand Layer 6 left-side (bbps1:2008 L11.0 - L11.11) to see if it fixes the problem with the QDC spectra.