    User name dhamilton

    Log entry time 15:56:16 on April 4,2011

    Entry number 354381

    keyword=Day shift summary

    Day shift summary

    9.00
    A few alarms on bbps1:2001 L10.02, detectors gas shed (methane) and
    left HRS dipole NMR lock. All are known problems.

    9.25
    Stopped run 3268 early to power-cycle the HV on BigHand layer 6 left-side (bbps1:2008 L11.0 - L11.11) to see if it fixes the problem with the QDC spectra. It did.
    We were advised to power cycle the HV on those 12 channels between stopping and starting runs.

    12:45
    Gas system interlock status alarm for gas shed airflow. Cleared again within seconds. Dipole NMR alarm still goes occasionally. bbps1:2201 L10.02 seems to have settled down.

    15.05
    MCC called to say that the beam will be down for around 30 minutes for injector tests. Stopped run 3273.

    15.25
    Beam back, checks done, back to production running with run 3274.

    ------------------------
    Run BCM_U1(C) SUM(C)
    3267 0.01872 0.01872 He4
    3268 0.00898 0.02770 He4
    3269 0.01772 0.04542 He4
    3270 0.01769 0.06311 He4
    3271 0.01769 0.08080 He4
    3272 0.01746 0.09826 He4
    3273 0.00416 0.10242 He4 -- stopped early due to loss of beam

    Total for shift = 0.10242 C