    User name Ramesh

    Log entry time 23:59:47 on April 4,2011

    Entry number 354418

    keyword=Shift Summary


    Left hrs P0 = 3.6014 GeV/c, angle = 20.3 deg.
    Right hrs P0 = 1.19635 GeV/c, angle = 24.5 deg.
    BigBit magnet (and HAND) angle = 92 deg.

    Liquid 4He 20 cm production runlist of the shift at 4 uA.

    18:04 Gas shed loud alarm for two LEDs: Gas Shed Airflow and Main Relay

    18:38 bbps1:2001 S13 L10.2 tripped.

    3275 a short run
    3276 junk run for some scaler display test
    3277 N6 right 4th PMT noisy, stopped the run and did recycle HV for that channel
    3278 N6 right 4th PMT still noisy, stopped the run and did recycle HV for that channel

    End of run 6281 missing, hence it's charge is not counted in the following.

    3282 ongoing

    Run BCM_U1(C) SUM(C)
    3273 0.00411 0.00411 4He
    3274 0.01817 0.02228 4He
    3275 0.00348 0.02577 4He
    3277 0.01118 0.03695 4He
    3278 0.01904 0.05599 4He
    3279 0.02279 0.07878 4He
    3280 0.01771 0.09649 4He
    Sum BCM U1 (C) = 0.09649