User name Ramesh
Log entry time 00:05:25 on April 6,2011
Entry number 354524
keyword=Shift Summary
Left hrs P0 = 3.6014 GeV/c, angle = 20.3 deg.
Right hrs P0 = 1.19635 GeV/c, angle = 24.5 deg.
BigBit magnet (and HAND) angle = 92 deg.
Plan: liquid 4He 20 cm production at 4 uA.
16:00 Hall is in controlled access.
16:28 MCC ready to send tune beam
16:35 Went to BeO target for beam recovery procedure. MCC has beam trip issues.
16:55 Beam recovery procedure finished and production starts.
22:50 Coda problem
22:25 Larger part of the problem start, lost HV of left HRS and HV of both VDCs.
24:00 Asked for controlled access.
Run BCM_U1(C) SUM(C)
3297 0.01726 0.01726 4He
3298 0.01771 0.03497 4He
3299 0.01773 0.05270 4He
3300 0.01771 0.07041 4He
Sum BCM U1 (C) = 0.07041