Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Carlos
Log entry time 07:58:42 on April 6,2011
Entry number 354567
keyword=Owl shift summary
Shift started with HRS and DAQ problems and a controlled access requested.
Problems with HRS were solved by 1am. IOC22 was rebooted. Also, ROC5 was physically powercycled in the Hall. We were back in production by 1:30AM.
1:00 Hall C inserted in halfwave plate (it is now IN).
5:30 MCC called notifying a problem with cryo epics. Beam down.
6:30 Beam is back. Production resumed.
Shift finished running production (run 3317)
Runlist
========
Run BCM_U1(C) SUM(C)
3312 0.00196 0.00196 4He
3313 0.01802 0.01998 4He
3314 0.01811 0.03809 4He
3315 0.01706 0.05515 4He
3316 0.01798 0.07313 4He
Sum BCM U1 (C) = 0.07313