Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jpchen
Log entry time 00:02:51 on April 8,2011
Entry number 354720
keyword=Swing shift summary
Swing shift summary:
Shift workers: J. P. Chen (SL), Nuruzzaman (TO), M. Shabestari(3rd)
16:00 Beam study, hall in controlled access.
17:00 Hall back to beam permit.
20:00 Moved target to EMPTY to allow beam tuning
21:00 Completed tuning beam, asked for beam position as in the white board. MCC informed us that they need to tune for Hall C
21:30 MCC came back to us. Beam position tuning.
21:40 Beam position good. Move target to BeO.
22:05 Raster check with BeO
22:10 Move to 4He, raster check.
22:20 DAQ problem, TS11 (needed reboot from hareboot30), then different ROCs.
23:00 Raster check, spot slightly larger than 2x2. Do another run, DAQ problem again.
23:10 beam off.
23:20 DAQ problem solved. wait for beam.
23:35 beam back, raster check.
23:45 beam off.
23:50 beam back.
23:55 start production run 3347.
24:00 run 3347 still on-going.