User name nmuangma
Log entry time 07:48:07 on April 8,2011
Entry number 354752
keyword=owl shift summary
SL:Navaphon Muangma
TO:Israel Yaron
3rd:Hyekoo Kang
-------------------------------------------------
With the beam back at the end of Swing shift, the whole shift is the production runs with a little trouble with CODA for the first 20 minutes.
---------------------------------------------------
We have some problem with the pion rejection plot on the left arm as the offset is off.
This is result with the change in the database. Someone made some change to it which result in the problem of the offset.
This problem is now fixed.
-------------------------------------------------------------
the production run list:
3348 full production
3349 short run because the Left HAND high voltage are all off.
3350-4 full productions
----------------------------------------------------------------