• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name nmuangma

    Log entry time 07:48:07 on April 8,2011

    Entry number 354752

    keyword=owl shift summary

    SL:Navaphon Muangma

    TO:Israel Yaron

    3rd:Hyekoo Kang

    -------------------------------------------------

    With the beam back at the end of Swing shift, the whole shift is the production runs with a little trouble with CODA for the first 20 minutes.

    ---------------------------------------------------

    We have some problem with the pion rejection plot on the left arm as the offset is off.

    This is result with the change in the database. Someone made some change to it which result in the problem of the offset.

    This problem is now fixed.

    -------------------------------------------------------------

    the production run list:

    3348 full production
    3349 short run because the Left HAND high voltage are all off.
    3350-4 full productions

    ----------------------------------------------------------------