User name Annand
Log entry time 15:53:09 on April11,2011
Entry number 355060
keyword=Day Shift Summary
April 11, 2011
SL: John Annand
TO: Zhihong Ye
3rd: David Hamilton
Day Shift Summary:
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Plan: SRC Producti on 755 MeV/c
Kinematic settings:
energy = 4.451 GeV
left HRS P0 = 3.6014 GeV/c
left HRS angle = 20.3 degs
right HRS P0 = 1.19635 GeV/c
right angle = -24.5 degs
08:00 Continue taking production data; Pmiss = 755 MeV/c
Lost beam at around 8.13....took about 1hr 45min before return
Heidi asked controlled access to check He system on LHRS while beam down
Q1 left was taken down for the check, ramped up again after finish
Beam returned around 9.50, checked position rates spot++ at 1uA
Return to production at 4uA around 10.00
HAND HV tripped off completely around 13.20, ended run 3417. HV off-on cycle seemed to clear fault...response very slow
Run Summary:
Run | Events | Ibeam [uA] | BCM U1 [C] | Accumulated Q [C] | Deadtime [%] | Target | Comments |
3412 | 1.0 M | 4.0 uA | 0.0177 | 0.0177 | 9 | 4He 20 cm | Production |
3413 | 0.07 M | 4.1 uA | 0.0011 | 0.0188 | 9 | 4He 20 cm | Production |
3414 | 0.04 M | 1.0 uA | 0.0 | 0.0188 | -- | -- | Spot++ |
3415 | 1.0 M | 4.0 uA | 0.0176 | 0.0364 | 9 | 4He 20 cm | Production |
3416 | 1.0 M | 4.0 uA | 0.0175 | 0.0539 | 9 | 4He 20 cm | Production |
3417 | 0.44 M | 4.1 uA | 0.0078 | 0.0617 | 9 | 4He 20 cm | Production |
3418 | 1.0 M | 4.1 uA | 0.0176 | 0.0793 | 9 | 4He 20 cm | Production |
3419 | Current | 4.1 uA | -- | -- | 9 | 4He 20 cm | Production |