• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Annand

    Log entry time 15:53:09 on April11,2011

    Entry number 355060

    keyword=Day Shift Summary

    April 11, 2011

    SL: John Annand

    TO: Zhihong Ye

    3rd: David Hamilton



    Day Shift Summary:

    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

    Plan: SRC Producti on 755 MeV/c

    Kinematic settings:


    energy = 4.451 GeV
    left HRS P0 = 3.6014 GeV/c
    left HRS angle = 20.3 degs
    right HRS P0 = 1.19635 GeV/c
    right angle = -24.5 degs




    08:00 Continue taking production data; Pmiss = 755 MeV/c

    Lost beam at around 8.13....took about 1hr 45min before return

    Heidi asked controlled access to check He system on LHRS while beam down

    Q1 left was taken down for the check, ramped up again after finish

    Beam returned around 9.50, checked position rates spot++ at 1uA

    Return to production at 4uA around 10.00

    HAND HV tripped off completely around 13.20, ended run 3417. HV off-on cycle seemed to clear fault...response very slow






    Run Summary:

















    Run Events Ibeam [uA] BCM U1 [C] Accumulated Q [C] Deadtime [%] Target Comments
    3412 1.0 M 4.0 uA 0.0177 0.0177 9 4He 20 cm Production
    3413 0.07 M 4.1 uA 0.0011 0.0188 9 4He 20 cm Production
    3414 0.04 M 1.0 uA 0.0 0.0188 -- -- Spot++
    3415 1.0 M 4.0 uA 0.0176 0.0364 9 4He 20 cm Production
    3416 1.0 M 4.0 uA 0.0175 0.0539 9 4He 20 cm Production
    3417 0.44 M 4.1 uA 0.0078 0.0617 9 4He 20 cm Production
    3418 1.0 M 4.1 uA 0.0176 0.0793 9 4He 20 cm Production
    3419 Current 4.1 uA -- -- 9 4He 20 cm Production