• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name nmuangma

    Log entry time 07:41:52 on April13,2011

    Entry number 355218

    keyword=owl shift summary

    April 13, 2011

    SL: Navaphon Muangma

    TO: John Leckey



    Owl Shift Summary:

    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

    Plan: SRC Production 755 MeV/c

    Kinematic settings:


    energy = 4.451 GeV
    left HRS P0 = 3.6014 GeV/c
    left HRS angle = 20.3 degs
    right HRS P0 = 1.19635 GeV/c
    right angle = -24.5 degs




    00:00 Continue taking production data; Pmiss = 755 MeV/c

    1:52 Half wave plate is OUT

    6:03 QE scan requested by MCC.








    Run Summary:















    Run Events Ibeam [uA] BCM U1 [C] Accumulated Q [C] Deadtime [%] Target Comments
    3446 1.0 M 4.0 uA 0.01788 0.01788 8.6 4He 20 cm Production
    3447 1.0 M 4.0 uA 0.01772 0.03560 8.5 4He 20 cm Production
    3448 1.0 M 4.0 uA 0.01759 0.05319 8.8 4He 20 cm Production
    3449 1.0 M 4.0 uA 0.01770 0.07089 9.5 4He 20 cm Production
    3450 1.0 M 4.0 uA 0.01731 0.08820 9 4He 20 cm Production
    3451 1.0 M 4.0 uA 0.01774 0.10594 9 4He 20 cm Production


    Sum BCM U1 (C) = 0.10594