NEXT
Make New Entry,
Make Followup Entry
User name S. Sirca
Log entry time 00:04:20 on April18,2011
Entry number 356072
keyword=Swing shift SUMMARY
SWING shift summary | S. Sirca (SL), P. Zhu (TO), M. Mihovilovic (3rd)
======================================================================
Events
------
16:00 Taking over from day shift with boiling studies
17:05 Moving to 20cm LD2 target
17:15 Trying to tweak the cryo targets to have more cooling power on LD2
and less on 4He (see (*1))
18:38 Moving to BeO target
18:08 Moving to optics target
19:40 Starting to move to kinematics 5.1
19:56 HRSL OK for kinematics 5.1, requesting 20uA on LD2
20:15 After minor adjustment of JT valves on 4He/LD2, requesting 45uA on LD2
21:00 HRSR OK for kinematics 5.1
Runs
----
#3629 15:52-16:02 60uA on 12C (3.10M, continuation of boiling studies)
#3630 16:08-16:22 45uA on 12C (2.59M)
#3631 16:25-16:26 30uA on 12C JUNK, wrong prescales
#3632 16:28-16:38 30uA on 12C (1.71M)
#3633 16:41-16:52 15uA on 12C (0.86M counts only, add another run)
#3634 16:54-17:01 15uA on 12C (0.46M)
#3635 17:11-17:13 60uA on LD2 (run stopped because target was not OK (see *1))
#3636 17:31-17:35 15uA on LD2 JUNK, target not stable
#3637 17:37-18:07 15uA on LD2 (5.09M)
#3638 18:10-18:21 30uA on LD2 (2.13M)
#3639 18:27-18:37 45uA on LD2 (2.29M)
#3640 18:47-19:02 5uA on BeO (0.12M)
#3641 19:12-19:35 5uA on optics target (0.13M)
#3642 20:30-20:34 45uA on LD2 JUNK, wrong prescales
#3643 20:36-20:58 45uA on LD2 (1.15M) HRSL only: HRSR D1 still settling
#3644 21:00-22:03 45uA on LD2 (3.20M) first run in kin 5.1 with both HRSL and HRSR
#3645 22:04-23:06 45uA on LD2 (3.08M)
#3646 23:07-00:03 45uA on LD2 (2.92M)
Comments
--------
(*1) the heater for LD2 went to zero.upon 60 uA, Alex adjusted JT valves