    User name V. Sulkosky

    Log entry time 00:08:46 on April 19, 2011

    Entry number 356262

    keyword=Swing Shift Summary April 18, 2011

    April 18, 2011
    SL: Vincent Sulkosky
    TO: Hisham Albataineh
    3rd: Xiyu Qiu

    Swing Shift Summary:
    ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
    Plan: BCM Calibration and x>2 Production
    Kinematic settings (4.2):
        energy = 3.356 GeV 
        left HRS P0 = 3.035 GeV/c
        left HRS angle = 23 degs
        right HRS P0 = 3.035 GeV/c
        right Q3 I = 1059.36 A
        right Q3 P0 = 2.6623 GeV/c
        right angle = -23 degs
    

    16:00 MCC setting up for BCM calibration.
    16:15 Start setting HRS-L and HRS-R to 3.035 GeV/c [in preparation for kinematics 4.2]
    16:49 Start BCM calibration with Faraday Cup IN: BcmLog_174 and HRS run 3685.
    17:26 Start BCM calibration with Faraday Cup out: BcmLog_176 and HRS run 3686.
    Current scan: 110, 100, 50, 25, 10, 5, 2, 1, 0.5, 0.2, 80, 60, 40.
    18:14 BCM calibration completed!
    18:15 Asked for Controlled Access for spectrometer move.
    18:55 Both spectrometers are now at 23 degrees.
    19:05 Asked for 2 uA on empty target and raster back on.
    19:07 Moved to BeO to check beam position and raster.
    19:17 Beam back.
    19:23 Move to Loop 1 4He 20 cm target.
    19:31 Target in place asked for 1 uA.
    19:39 Asked for 95 uA for production.
    21:19 Ask to move to carbon 5 mm target.
    21:27 Target in position. Asked for 95 uA.
    21:48 Move to Dummy 4 cm.
    21:51 Ask for 40 uA.
    22:02 Asked for access for Dave Meekins to warm up the target.
    22:10 Change right arm momentum to 2.678 GeV/c; RQ3 = 2.3492 GeV/c; RQ3 Iset = 938.22 A
    22:45 Controlled access complete. Both Loop 1 and 2 are warming up.
    23:18 Vacuum has recovered enough for beam.
    23:37 Right HRS dipole NMR finally locked.
    24:00 End shift with run 3695.


    Run Summary:
    Run Events Time [mins] Ibeam [uA] Good Events* Accumulated Events* Deadtime [%] Target Comments
    3684 169 0.6 N/A N/A N/A N/A Empty Junk
    3685 61k 12 N/A N/A N/A 8.6 Empty BCM Calib. w Faraday Cup
    3686 262k 47 N/A N/A N/A 8.0 Empty BCM Calib. w/o Faraday Cup
    3687 11.5k 4.2 5 N/A N/A 15.2 BeO Raster Check
    3688 11.3k 4.4 1 N/A N/A 15.8 He4 20 cm Raster Check
    3689 26.5k 0.8 95 N/A N/A 27 He4 20 cm Junk
    3690 1.2M 47.0 95 20772 20772 18 He4 20 cm Production
    3691 1.15M 48.4 95 20428 41200 17 He4 20 cm Production
    3692 0.5M 17.7 95 41081 41081 13 Carbon 5 mm Production
    3693 77k 8.2 40 2840 2840 5.4 Dummy 4 cm Production
    3694 99.5k 30.5 20 2244 5084 18 Dummy 4 cm Production LHRS only
    3695 20 N/A N/A 19 Dummy 4 cm RHRS Optics