    Swing Shift Summary: 16:00 - 24:00 May 4th, 2011

    Shift Crew

    SL: Yi Qiang
    TO: Jian-ping Chen
    Replay: Donal Day

    Shift Summary

    16:00 Shift starts at the end of beam study, Hall is ready for beam tuning.
    16:22 Target moved to EMPTY for beam tuning.
    18:00 Beam tuning done, start BCM calibration.
    19:25 BCM calibration done, move target to BeO for raster check.
    19:35 Raster is set to 3x3(4.5x3 MCC value), move to 3He for production.
    20:00 Start production with 120 μA beam since run 4112.
    23:10 Finished 29.5k 3He events (1/3 of planned), moved to 5 mm C per RC's request.
    23:10 Beam is off due to MCC IOC problem.
    24:00 Still waiting for beam.

    Run Summary

    Kinematics 4.2
    PHRS = 3.035 GeV/c
    θHRS = 23°

    Run # Type Target Current Event # Comment
    4109 BCM Cross Calibration EMPTY 120 μA - 2 μA 480k BCM/log_177; T8 = 100 Hz
    4110 BCM Linearity Test EMPTY 120 μA - 2 μA 263k BCM/log_178; T8 = 100 Hz
    4111 Raster check BeO 5 uA 23k Raster Size 3x3 (MCC 4.5x3)
    4112 Production 20 cm 3He 120 μA 777k good event # 3576
    4113 Production 20 cm 3He 120 μA 192k good event # 1591
    4114 Production 20 cm 3He 120 μA 1M good event # 7605
    4115 Production 20 cm 3He 120 μA 1M good event # 8222
    4116 Production 20 cm 3He 120 μA 1M good event # 8512