SL: Yi Qiang
TO: Jian-ping Chen
Replay: Donal Day
16:00 Shift starts at the end of beam study, Hall is
ready for beam tuning.
16:22 Target moved to EMPTY for beam tuning.
18:00 Beam tuning done, start BCM calibration.
19:25 BCM calibration done, move target to BeO for
raster check.
19:35 Raster is set to 3x3(4.5x3 MCC value), move to 3He
for production.
20:00 Start production with 120 μA beam since run
4112.
23:10 Finished 29.5k 3He events (1/3 of planned), moved
to 5 mm C per RC's request.
23:10 Beam is off due to MCC IOC problem.
24:00 Still waiting for beam.
Kinematics 4.2
PHRS = 3.035 GeV/c
θHRS = 23°
Run # | Type | Target | Current | Event # | Comment |
---|---|---|---|---|---|
4109 | BCM Cross Calibration | EMPTY | 120 μA - 2 μA | 480k | BCM/log_177; T8 = 100 Hz |
4110 | BCM Linearity Test | EMPTY | 120 μA - 2 μA | 263k | BCM/log_178; T8 = 100 Hz |
4111 | Raster check | BeO | 5 uA | 23k | Raster Size 3x3 (MCC 4.5x3) |
4112 | Production | 20 cm 3He | 120 μA | 777k | good event # 3576 |
4113 | Production | 20 cm 3He | 120 μA | 192k | good event # 1591 |
4114 | Production | 20 cm 3He | 120 μA | 1M | good event # 7605 |
4115 | Production | 20 cm 3He | 120 μA | 1M | good event # 8222 |
4116 | Production | 20 cm 3He | 120 μA | 1M | good event # 8512 |