    User name cisbani

    Log entry time 00:02:43 on May 6,2011

    Entry number 358321

    keyword=Swing Shift Summary

    Swing Shift Summary May 05 2011

    16:05 Move target to BeO

    16:10 Beam delayed by 15 min

    16:50 Ask for Harp Scan, but cannot be done due to some software failure in MCC; we postponed the scan

    17:15 Start BeO, 5 uA raster off, kin 5.0 / Sieve SLit IN on both detectors

    18:10 The BPM 4A x is at about 1.4 instead of 0.67; asked MCC to move.

    18>30 Move to Optics target

    20:20 Done with Optics, ask MCC to do the harp scan

    20:25 Ask for Controlled Access to remove the Sieve Slit in the RIGHT Arm

    20:30 Change Kinematics to 5.05 (Left) and 5.2 (Right)

    21:50 Start data taking

    Statistics
    Run Events
    --- BeO / 5 uA / Raster Off / Kin 5.05
    4200
    --- Optics / 50 uA / Raster Off / Kin 5.05
    4201
    4202
    4203
    4204
    4205
    --- move to new kinematics: L=5.05, R=5.2, 12C, 95 uA
    4209 250k
    4210 250k
    --- change target to 40 Ca, 40 uA
    4211 250k
    4212 240k
    4213 110k
    --- change target to 48 Ca, 40 uA
    4214 ... running at the end of the shift