Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name cisbani
Log entry time 00:02:43 on May 6,2011
Entry number 358321
keyword=Swing Shift Summary
Swing Shift Summary May 05 2011
16:05 Move target to BeO
16:10 Beam delayed by 15 min
16:50 Ask for Harp Scan, but cannot be done due to some software failure in MCC; we postponed the scan
17:15 Start BeO, 5 uA raster off, kin 5.0 / Sieve SLit IN on both detectors
18:10 The BPM 4A x is at about 1.4 instead of 0.67; asked MCC to move.
18>30 Move to Optics target
20:20 Done with Optics, ask MCC to do the harp scan
20:25 Ask for Controlled Access to remove the Sieve Slit in the RIGHT Arm
20:30 Change Kinematics to 5.05 (Left) and 5.2 (Right)
21:50 Start data taking
Statistics
Run Events
--- BeO / 5 uA / Raster Off / Kin 5.05
4200
--- Optics / 50 uA / Raster Off / Kin 5.05
4201
4202
4203
4204
4205
--- move to new kinematics: L=5.05, R=5.2, 12C, 95 uA
4209 250k
4210 250k
--- change target to 40 Ca, 40 uA
4211 250k
4212 240k
4213 110k
--- change target to 48 Ca, 40 uA
4214 ... running at the end of the shift