    keyword=Setup for low current BCM test - Current in Hall A limited to 5 uA

    We unplugged the downstream BCM at the splitter level. The signal before
    the splitter was sent through a cable to the Happex DAQ with an amplifier
    inline. So effective signal will have +3 dB, we will try with the
    splitter after.
    The plan is to try to resume beam with empty target first when we manage
    to open the valves in the beamline and take a first set of currents to
    have a quick look at the BCM response.
    
    Once done we will try to put a target in to monitor the rates with the
    HRS but that might spoil the vacuum so we will see how it goes from there.
    