    User name V. Sulkosky

    Log entry time 23:09:12 on May 09, 2011

    Entry number 358752

    This entry is a followup to: 358750

    Followups:

    keyword=Run Plan Tonight

    With the left Q1 problem, we are stuck.  The left HRS is of course the 
    electron arm and crucial for any measurements.  For the rest of swing
    shift, we will take a run for the right HRS to verify that the timing
    has been fixed.  Afterwards, owl shift will be in stand by with the 
    target operator being required to watch the target.
    
    The Techs will resume work in the morning on the left Q1 power supply.  
    With the lose of owl shift and probably a good part of day shift, we need
    to re-evalute the run plan for the rest of this week.
    