User name V. Sulkosky
Log entry time 23:09:12 on May 09, 2011
Entry number 358752
This entry is a followup to: 358750
Followups:
keyword=Run Plan Tonight
With the left Q1 problem, we are stuck. The left HRS is of course the
electron arm and crucial for any measurements. For the rest of swing
shift, we will take a run for the right HRS to verify that the timing
has been fixed. Afterwards, owl shift will be in stand by with the
target operator being required to watch the target.
The Techs will resume work in the morning on the left Q1 power supply.
With the lose of owl shift and probably a good part of day shift, we need
to re-evalute the run plan for the rest of this week.