With a couple of minor problems along the way, we now have the NMR probes for the dipoles on serial interfaces. William Lu now has the teslameters in the soft ioc database. There is also a sequencer that was put on the soft ioc. We now have operational controls. I ran the RQ1, RD1, and LD1 up to 0.6 Gev/c through the software regulator, and back down. The NMR locked fine on the B probes for both arms. This job is now complete. Yay.