    User name Zhihong Ye

    Log entry time 09:24:54 on March 06, 2012

    Entry number 364227

    keyword=G2p/Gep Status

     March 5th Day Shift ~ March 6th Owl
    1, Restricted Access requested at 7am and the hall open at 8am. 
    
       Since Harp was not working and BPM calibration could not complete, we
    postponed the Chicane change to Tuesday, and focusing on fixing the
    Harps. Experts did not found the source of problems. After beam permit
    and checking with beam, We found out that signals from Harp 1H04 became
    clear although experts did not fix any problems. Harp 1H05 gave weak
    signal on top of large background with 5uA pulse beam and to make the
    peaks clear, we increased the beam current to 8uA (pulse beam) and
    finished the Harp scan and BPM calibration at Tuesday 6:50am.
    
    2, R-VDC1 fixed:
       Bogdan swapped HVs of R-VDC1 & R-VDC2 and found out that efficiencies
    of VDC2 planes became bad. Jack replaced the Power Supply and now both
    VDCs are working perfectly.
    Alex and Pengjia
    3, BPM fixed:
       John Musson found some connections problems and BPM signals become
    clear after fixing them.
    
      March 6th Day (Tuesday)
    
    1, Restricted Access to change Chicane, ramp up Target magnets, and
    continue working on Harp fixed.
    


    A copy of this log entry has been emailed to: doug,jpchen,slifer,rom,camsonne,g2p,g2p_ana