Put the stick in the home position (target out) while the bpm stuff gets done. The nose is being kept filled with liquid, so hopefully the target will do a decent job of thermalizing while the BPM and BCM calibrations happen. After the ~1 hour bpm runs, we will take a TE on both cells, and then we will drain the helium for the optics runs.