We are running 100 nA; just the calibration is off.
We fixed the blead thru issue last night by closing the Hall A slit. Unless, someone at MCC opened it, it shouldn't be an issue.
We can run lower currents then 100 nA, though we were indeed worried about Hall-C blead-through returning during the night.