MCC has spent three hours for the beam tunning with Moller settings. MCC can deliver 100nA of CW beam current with the beam passing through the Compton chicane only with large (+3mm up) vertical shift on the Moller target (BPM 1H01).
Most likely we need straight beam for the Moller measurements.
In addition we have a problem with HV tripping (see halog 366049).