NEXT
Make New Entry,
Make Followup Entry
User name marble
Log entry time 10:53:19 on March 13, 2012
Entry number 366211
keyword=Hall A Venting and Pumpdown Of Beam line between Experiment Runs
8:23 Turn off VCG1H01.
8:24 Close VBV1H01B.
8:25 Start Venting.
8:32 @ 760 Torr, Start Alignment.
9:20 Start Pump down.
9:26 @ 20 Torr.
10:05 @ 300 mTorr, Start Turbo.
10:07 @ 0 mTorr.
10:08 Turbo Full speed.
10:09 Turn On VCG1H01; Pressure @ 1.0e -5 Torr.
10:11 Open VBV1H01B.
10:13 Pressure @ 9.9e -6 Torr, All Valves are Open.
10:15 Leave Hall.