• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name marble

    Log entry time 10:53:19 on March 13, 2012

    Entry number 366211

    keyword=Hall A Venting and Pumpdown Of Beam line between Experiment Runs

    8:23 Turn off VCG1H01.
    8:24 Close VBV1H01B.                                                   
    8:25 Start Venting.
    8:32 @ 760 Torr, Start Alignment.
    9:20 Start Pump down.
    9:26 @ 20 Torr.
    10:05 @ 300 mTorr, Start Turbo.
    10:07 @ 0 mTorr.
    10:08 Turbo Full speed.
    10:09 Turn On VCG1H01; Pressure @ 1.0e -5 Torr.
    10:11 Open VBV1H01B.
    10:13 Pressure @ 9.9e -6 Torr, All Valves are Open.
    10:15 Leave Hall.