Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name pzhu
Log entry time 08:12:30 on March31,2012
Entry number 368555
keyword=owl shift summary
0:35 move target to do dilution run
1:07 dilution run done, move target back to top NH3
kalyan changed the beam position to check the rate in 3rd arm
1:34 controlled access for the target vacuum pump check
2:30 back to beam permit,changed septum current matched to 1.667GeV P0
2:40 kalyan changed the beam position to check the rate in 3rd arm, 3rd arm rate is higher than before.
3:15 start production run for 1.667GeV/c setting
5:47 bleed-through measurement
production run summary for 1.667GeV/c:
L 3519 3520 3521 3522 3523 3524 3525 3526
R 22551 22552 22553 22554 22555 22558 22559 22560