    User name J. Butler(tech)

    Log entry time 16:46:18 on April 11, 2012

    Entry number 372788

    keyword=Checklist

    Checklist Complete

    The tech on call at start up is Andrew

    The sieves were out but should be verified by run coordinator prior to start-up.

    Note: Did not have MCC cycle valves because the system state was unchanged during the restricted access. Bad cold cathode gage on right arm that needs replacing (part on order). In the event that one of the septum power supplies has a fault both power supplies should be immediately set to zero until the issue has been resolved.