NEXT
Make New Entry,
Make Followup Entry
User name
Log entry time 20:00:58 on April 16, 2012
Entry number 375541
This entry is a followup to: 375530
keyword=Change the #7 in the plan, it hit the safty limit.
Forget the #7 in the original plan.
Follow this one:
Switch to the CH2, if possible, drain LHe nA (call Dustin). Put 100nA
non-raster beam on it.
Take at least 20 minutes events till you can fit the H peak.
A copy of this log entry has been emailed to: jpchen, slifer, jmaxwell, cg2ja,mhuang