At start of shift waiting for beam.
19:15 beam is tuned to the Hall
19:30 put C target with hole in
The target was set at old nominal position and the bean was adjusted.
At the end the target position had to be offset 5mm UP (positive encoder
offset)
22:40 we are ready to start beam position scan runs and prompt lost beam.
23:30 started the actual running.
All the work is left for the next shift.