    User name Chao

    Log entry time 00:01:41 on April 28, 2012

    Entry number 379868

    keyword=Swing shift summary

    Shift workers:
    Chao Gu(SL), Kiadtisak Saenboonruang(TO), Vina Punjabi(3rd)
    
    16:00 Shift starts. We are taking production data for 0.8094GeV setting
    with LHRS. RHRS is still moving.
    16:20 RHRS settled. We start to take data on both arms.
    17:30 Beam energy dropped by 0.2MeV. Ask MCC to check, and they moved it
    back.
    19:30 IHWP changed to IN by Hall C, we have 115M events at this momentum
    taken with IHWP OUT
    20:40 We found that the previous shift crew forgot to turn on the Q1
    regulation when they are moving the LHRS momentum setting. We are using
    wrong Q1 current start from 15:20 (5160-5175). I moved it back.
    24:00 Smoothly take production data until midnight. Shift ends.
    
    Production run# at 0.8094GeV
    5163/     /41797     7.0M
    5164/23995/41798     21.0M
    5165/23996/41799     29.5M
    5166/23997/41800     43.5M
    5167/23998/41801     57.5M
    5168/23999/41802     70.2M
    5169/24000/41803     84.2M
    5170/24001/41804     98.2M
    5171/24002/41805     112.2M
    5172/24003/41806     114.8M
    5173/24004/41807     128.8M
    5174/24005/41808     141.6M
    5175/24006/41809     148.8M
    (form 5163 to 5175, LHRS Q1 current is not correct)
    5176/24007/41810     162.8M
    5177/24008/41811     176.8M  
    5178/24009/41812     190.8M
    5179/24010/41813     204.8M
    5180/24011/41814     218.8M
    5181/24012/41815     230.5M
    5182/24013/41816     244.5M
    5183/24014/41817     258.5M