• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name J Mulholland

    Log entry time 19:36:40 on April 29, 2012

    Entry number 380719

    keyword=[Target] Target work in the Hall

    The target has been rotated to 6deg

    The magnet is ramping to 5T and the microwaves have been changed to 140Ghz

    The previous stick was filled (see target logbook) and installed (standard length for both cups).

    Same .125 in thick carbon target and dummy target are on the target ladder

    TE measurements should be taken during the swing and owl shift once target is at field.