Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name M. Yurov
Log entry time 01:44:31 on May 4,2012
Entry number 382076
keyword=[target] LHe in the nose, moved target
While waiting for controlled access to take sieve out we got LHe in the nose.
Run Valve was on 0.51, Cups temp dropped to ~1.6K, level was 8.9%
Closed Run valve (0.0). Wait. Temp raised up to ~15K
But since we did not see the T1/T3 rates with sieve out we just assumed that there is no LHe
Moved target to CH2_hole
Took data
Quickly refill the nose by openning Bypass valve to check the rates
Rates increased from 45 to 75K so we were good (no LHe)
Closed Roughing and Bypass valves
Moved to Home Position