keyword=add delay to gates, see data now
I added 650 nsec delay to the gates for LHRS DAQ. See the
circuit in fig 1. This may not be optimal yet, but we need
something like this.
I had to add a discriminator after the delay, else the NIM/ECL
would not fire.
I also put two copies of the T1 into one of the TDCs and called
them (temporarily) a V1 channel. I see these hits (fig 2), so
this shows that the trigger + DAQ + software is working.
I noticed that from the Hall A Tools GUI the VDC HV is off and
the thresholds are off. Are we still controlling them this way ?
Turning those on would lead to better results on the VDCs ...